Master-class on laying walls of cinder block

Before you start building walls, you need to make a foundation for them. In this case, it is a strip foundation that was pre-aligned with brickwork.
 make the foundation
1. The first step is to clear the foundation of debris.
 clear the foundation of debris
2. To level the irregularities on the foundation, it is necessary to prepare a sparse solution. Make a solution from a mixture of sand and cement brand M 400.
 prepare a thin solution
3. Then you should align uneven places.
 align uneven spaces
4. Before starting the construction of walls it is necessary to install waterproofing. To do this, take the roofing material and cut into the desired size.
 install waterproofing
5.Roofing material is convenient to cut to one person with the help of a nylon thread and a brick.
 using a nylon thread and brick
6. To do this, lay the ruberoid on a flat surface, and on top of the kapron thread tied to a brick.
 we lay down roofing material
7. The next action is bending the ruberoid to the desired size, in our case, in half.
 bending of roofing material
8. Take the free end of the thread in your hand.
 Take the free end of the thread in your hand
9. We step on the roofing felt and try to pull the thread through the folded edge of the roofing material, thereby cutting it.
 trying to draw
10. After cutting the required amount of waterproofing, we place it on the foundation.
 laying it on the foundation
11. In order for the waterproofing not to be blown away by the wind, it is pressed with cinder blocks.
 is pressed with cinder blocks
12.We start laying the walls with the institution of angles.
 start laying walls
13. After the corners are dialed and checked, we start laying the wall.
 start laying the wall
14. We lay the solution under the block.
 We lay the solution under the block
15. In order to bond the blocks together, it is necessary to impose a solution on the block end. 1033-skrepit-bloki.jpg "alt =" staple blocks "title =" staple blocks ">
16. Installing the block in its place, while pressing it to the next block.
 Install the block
17. To keep the walls smooth, we make laying under the cord-quay, which is mounted on a bracket made of electrode wire No. 3 by bending it in half.
bending it in half

18. We stretch the mooring cord along the entire length of the wall, securing the brackets with bricks on the corner blocks.
 We make the stretch of the mooring cord
19.In this case, the thread of the cord-mooring should be strongly tensioned. The tension is produced to such an extent that the bracket is at the limit of pulling out from under the brick.
 pulling out from under the bricks
20. The consistency of mortar for masonry blocks should not be liquid. To save mortar, we lay the bed only on the area of ​​contact between the block and the working surface.
 The consistency of mortar for masonry
21. When laying the block, the solution will fill only the necessary parts of the contact.
 will fill only the necessary parts
22. The subsequent block is set in its place. Since the solution is non-liquid, the block will be above the level of the cord-mooring.
 solution non-liquid
23. Then the unit must be seated with a pickaxe to the level of the cord-mooring. When the block shrinks, the extra cement-sand mortar is squeezed out of the seam.
 the solution is squeezed out of the seam
24.Remove the excess solution using a trowel.
 Remove excess solution
25. In this way, we put the blocks block by block before the construction of the required structure.
 make laying block by block
As a result, we get a reliable design, which can be used as a barn in the future.
 Master class in cinder block masonry


Related News:


What should be the decoration of the children's room
Three for a podium bed in a compact bedroom
How I spent summer pictures for children
Lemon Cherry Pudding
Robots-dogs have learned to open and hold the door themselves
Carrot juice as an element of healthy nutrition
How to make a tornado in a bank by yourself